• Home
  • News
  • Experience
    • Civil Engineering
    • Building
    • Restoration
  • Policies
    • Registration
    • Quality
    • Health & Safety
    • Environmental
  • Clients
  • About Us
    • What we do
    • How we do it
    • Who does it
    • Our History
    • News2
  • Contact
×

Experience

Restoration Works

Filter by sector

  • All sectors
  • Restoration Works

Upgrade of Wolfe Tone St & Park

The works include realignment of Wolfe Tone Street to improve pedestrian facilities and upgrade works on Wolfe Tone Park

View Project

Tandy's Lane Park

Construction of a new park off Tandy's Lane in South Dublin

View Project

Russell Street Retaining Wall Repairs

Works were undertaken to infill existing coal cellars and repair a retaining wall along Russell Street

View Project

Dodder Flood Alleviation Works

Dodder Flood Alleviation Works - New Bridge Parapet Raising and Strengthening

View Project

Refurbishment of Classons Bridge

Refurbishment of Classons Bridge, a stone arch bridge circa 1790 and widened in 1928. The widening consisted of cast insitu concrete decks with steel beams on both sides of the existing structure.

View Project

Old Nangor Road Widening Works

Widening of 120m of the Old Nangor Road including the demolition and reconstruction of a protected stone masonry wall.

View Project

Fairview Footbridge Refurbishment Contract

Replacement of the existing steel truss deck with a tubular steel arch deck, replacement of the upper access ramp on the outbound side and refurbishment of all steelwork which included cleaning and repainting.

View Project

Repair/Reconstruction of Chesterfield Avenue, Phoenix Park

Reconstruction of existing road build up of Chesterfield Avenue from Mountjoy to Gough Roundabout, repair roadworks from Castleknock Gate to Mountjoy Roundabout.

View Project

Rye River Restoration Works

Refurbishment of the existing stone masonry retaining wall structure along the bank of the River Rye at the entrance to Leixlip Castle.

View Project

N7 Naas Road Widening & Interchanges Scheme

Upgrade of 14km of dual carriageway to 3 lane carriageway, the construction of 16km of local roads, 4 No. new grade separated interchanges and upgrade works to 2 other interchanges.

View Project

© Clonmel Enterprises LTD.

  • Home
  • Cookie Policy

We use Cookies By using this website, you consent to our cookies policy

don't show again