Project Description

Client
Dublin City Council
Architect
OCSC
Location
Fairview, Dublin

Replacement of the existing steel truss deck with a tubular steel arch deck, replacement of the upper access ramp on the outbound side and refurbishment of all steelwork which included cleaning and repainting.

Key Elements

  • Traffic and pedestrian management in an urban location including lane closures, bus lane closures and a full 'all stop' to remove and reinstall the structure
  • Design and installation of temporary public access stairs to manage pedestrian movements on the bridge while sandblasting and recoating of the ramps was undertaken
  • Design and installation of temporary works and scaffolding
  • Procurement and installation of new bridge deck and ramps
  • Waterproofing and application of slip resistance surfacing on the entire structure