Druid’s Glen Road P* to P3

Civil Engineering / River/Marine / Road Construction & Enabling Works / Structures / Utilities / Water & Waste Water

This project consisted of the construction of approximately 400m of new single carriageway along with a 3-span bridge over the Cabinteely Stream.

Project Description

Client
Dun Laoghaire Rathdown County Council
Designer
DBFL Consulting Engineers
Location
Bride's Glen Road, Cabinteely, Co Dublin

Key Elements

  • Design and implementation of temporary traffic management to facilitate the works
  • Earthworks to level the site including cut and fill operations
  • Construction of a 3 span structure over the Cabinteely Stream, with piled foundations
  • Installation of new SuDS compliance drainage network including a new attenuation pond
  • Installation of all services including watermain, foul sewer, gas main, power and comms
  • All pavement layers
  • Construction of new footpaths and cycletrack
  • Installation of new public lighting
  • Extensive landscaping works