Latest articles, insights and news
Druid’s Glen Road P* to P3
This project consisted of the construction of approximately 400m of new single carriageway along with a 3-span bridge over the Cabinteely Stream.
Clontarf to City Centre Cycle Route
This project will provide segregated cycling facilities and bus priority infrastructure along a 2.7km route from Clontarf Road at the junction with Alfie Byrne Road…
Whitestown Stream Park Upgrade Works
The project was undertaken to upgrade a linear park located along either side of Whitestown stream and to improve access via upgrading an existing footbridge…
Dodder Greenway – Donnybrook to Herbert Park
This project involved the construction of the next phase of the Dodder Greenway, a combined walkway and cycleway. Part of this greenway is cantilevered over…
Ballyogan Access Road
Construction of a new link road from Northfield Road to Ballyogan Road to facilitate development of the area.
N81 Knockroe Bend Realignment
The project required the realignment of the Knockroe Bend on the N81 for a distance of approximately 1km.
N80 Maidenhead Realignment Scheme
This scheme was undertaken to realign the existing N80 at Maidenhead for a distance of 2km.
N25 Remedial Works Contract
Remedial works on the local road network which is to be handed over to the Local Authority on completion of all defects
M50 Gantry
Erection of a new gantry and construction of associated technical shelter and associated civil works
Pedestrian & Cycle Bridges over the Royal Canal
This scheme involved the design and construction of two bridges, one bridge dedicated to pedestrian use, with the second bridge provided for cyclists only.
Dunboyne Link Road Bridge
This design and build scheme included the construction of a new river bridge and continued the link road from the Moyglare road to the Dunboyne…
Russell Street Retaining Wall Repairs
Works were undertaken to repair an existing retaining wall along Russell Street and infill existing coal cellars.