Latest articles, insights and news
Refurbishment of Beaver Row Footbridge
Removal of the existing Beaver Row Footbridge and central support column, restoration off site, followed by refitting on a new central foundation and repaired abutments.
UCD Foul Sewer Expansion & Utility Works
Installation of new services within the UCD campus to facilitate expansion and building works.
Grange Castle Business Park South – Construction of Access Road
Construction of 650m of carriageway to provide a new access to Grange Castle Business Park.
Sign Refurbishment Programme – Call Off 8
Term maintenance contract for sign maintenance works on the following carriageways N4, N5, N60 and N61.
Sign Refurbishment Programme – Call Off 4
Term maintenance contract for sign maintenance works on the following carriageways N6/M6, N51, N52, N53, N54, N55, N63 and N87.
R680 Green Route Phase 1D
Realignment of 1km of the existing urban R680 including the construction of a new roundabout at Gladstone Street.
Coillte Threerock Mast & Communications Site
Construction of a new compound, mast base for a 65m lattice tower structure, communications building and all associated site works within the forest boundary.
M9 Kilcullen Motorway Service Area
Construction of grade separated junction on the existing M9 Motorway to provide access to a proposed Motorway Service Station.
Ballymore Eustace Sludge Treatment Plant
Construction of a new Sludge Treatment Facility within the Ballymore Eustace Water Treatment Plant.
Refurbishment of Classons Bridge
Refurbishment of Classons Bridge, a stone arch bridge circa 1790 and widened in 1928. The widening consisted of cast insitu concrete decks with steel beams…
Dodder Valley Cycle Network Scheme
Construction of 1.65km of a 4m wide shared cycle track/footway through the Dodder Valley Park.
Ongar Castaheany Cycle Network Scheme
Installation of a shared surface and designated footpaths and cycletracks in 6 No. locations around the villages of Ongar and Castaheany approaching a number of…











