Latest articles, insights and news
Sallins Flood Alleviation Scheme
Installation of twin Ø1200mm pipe culverts under the Dublin-Cork railway line to provide a new outfall to alleviate flooding to the Waterways Estate.
M8/M11 Gantry Design and Build Project
Design and construction of 12 No. steel cantilever gantries over 2 No. motorways.
M4/N4 Gantry Design and Build Project
Design and construction of 25 No. steel gantries, both cantilever and portal structures over dual carriageway and motorway traffic and the installation of 10 no.…
Kildare Route Contract No.2
Upgrading of 6.1km of track bed and the construction of a new railway station.
Gantry Design and Build Contract No. 1
Design and construction of 10 No. gantries, both portal and cantilever design over 3 No. motorways.
Phibbs Crossing Over Bridge Sligo
Construction of concrete overbridge to facilitate the removal of a level crossing.
Outer Ring Road Phase 2 (Adamstown-N4)
Construction of 4.5km of new dual carriageway and the upgrading of 2.5km of single carriageway to dual carriageway.
Aerodrome Business Park
Development of a new business park adjacent to the Greenogue Industrial Park in Rathcoole. Works included site clearance, earthworks, full construction of all internal roadways…
N7 Naas Road Widening & Interchanges Scheme
Upgrade of 14km of dual carriageway to 3 lane carriageway, the construction of 16km of local roads, 4 No. new grade separated interchanges and upgrade…
Kilmacanogue Footbridge
This footbridge structure is the only stressed ribbon bridge in Ireland and one of only a handful in the world.