Project Description
- Client
- RTE
- Designer
- ARUP
- Location
- Donnybrook, Dublin 4
The project was undertaken to construct a new entrance to RTE from the N11 and reconfigure the internal road layout of the site to allow for the closure of the existing entrance.
Key Elements
- Installation of a new signalised junction on the N11 and a new separate pedestrian crossing
- Liaising with Dun Laoghaire Rathdown County Council and Dublin City Council to obtain the road opening licence and associated T2 licences
- Demolition and site clearance works
- Installation of extensive services throughout the site and relocation of existing services such as watermain, drainage, ducting and public lighting
- Relocation of existing bus stops and liaising with Dublin Bus to agree same
- Full pavement construction of all internal roads and reconstruction of existing N11 to create a new junction
- Rotation of the steps of the existing overbridge
- Installation of pollution control measures within the RTE site
- High quality paving works to construct the new plaza and installation of new RTE sign
- Construction of new footpaths and cycletracks on the public road
- Design and implementation of all temporary traffic management both internally on the site and externally on the N11