Project Description
- Client
- National Roads Authority (TII)
- Architect
- Roughan O'Donovan
- Consultant
- WYG/RPS
- Location
- M8(Cashel)/M11 (Wicklow)
Design and construction of 12 No. steel cantilever gantries over 2 No. motorways.
Key Elements
- Construction of reinforced concrete bases for all gantries
- Coordination of concurrent multiple crews at multiple sites for both the construction of the bases and installation of the gantries
- Complex traffic management on 2 No. motorways required to construct the bases in the verge and lane closures required for the erection of the gantries
- Installation of all sign faces on the gantries and a number of low level verge signs
- Protection and diversion of all services during the works
- Liaising with Local Authorities and the Emergency Services to coordinate the traffic management plans