Project Description

Client
Egis Lagan/TII
Consultant
Atkins Member of the SNC-Lavalin Group
Location
M7, M8, N25, N40

Works to install and prove existing ducting were undertaken along the M7, M8, N25, N27 and N40 routes

Key Elements

  • Installation of ducting and associated access chambers in both the verge and hardshoulder were required
  • Working at night to facilitate high traffic volumes around Cork and Newbridge and working to strict programmes to reopen the road each morning
  • Undertaking road crossings using both open cut and trenchless methods, including through rock
  • Reinstatement of motorway surfacing to TII specifications
  • Proving existing ducting and carrying out repairs where necessary
  • Removal and re-erection of safety barrier and road signage where necessary for the works
  • Reinstatement of footpaths and structure concrete rubbing strips where required
  • Liaising with all Utility providers to protection or carry out minor diversions where required