Project Description
- Client
- Iarnrod Eireann Construction Unit
- Location
- Collooney, Co. Sligo
Construction of concrete overbridge to facilitate the removal of a level crossing.
Key Elements
- Use of rotary bored steel piled foundations and bank seat adjacent to the railway line
- Construction of access roads including earthworks, drainage and surfacing
- Installation of precast beams over the live railway line
- Cast insitu reinforced concrete deck and precast concrete parapets
- Design and implementation of all temporary works
- Working under the line possession arrangements with Irish Rail