• Home
  • News
  • Experience
    • Civil Engineering
    • Building
    • Restoration
  • Policies
    • Registration
    • Quality
    • Health & Safety
    • Environmental
  • Clients
  • About Us
    • What we do
    • How we do it
    • Who does it
    • Our History
  • Contact
×

Experience

Civil Engineering

Filter by sector

  • All sectors
  • Structures
    • Bridges
    • Gantries
    • Walls
  • Road Construction
    • Streetscapes
    • New Construction
    • Upgrade Works/Reconstruction
  • Utilities
  • Water & Waste Water
  • Road Network Asset Management
  • River/Marine
  • Rail

Tolka Quay & Alexandra Road Watermain Upgrade

Upgrading of the existing watermain along Tolka Quay Road, Alexandra Road and various branch roads

View Project

Tandy's Lane Park

Construction of a new park off Tandy's Lane in South Dublin

View Project

M50 Gantry

Construction of a new gantry and technical shelter on the M50

View Project

Extension to the IDA Park, Mullagharlin, Dundalk

This aim of this project is to extend the existing infrastructure in the IDA Park in Mullagharlin, Dundalk, with new access road and utility infrastructure

View Project

N81 Knockroe Bend Realignment

The project requires the realignment of the Knockroe Bend on the N81 for a distance of approximately 1km

View Project

N80 Maidenhead Realignment Scheme

This project has been undertaken to realign the existing carriageway at Maidenhead for a distance of 2km in County Laois

View Project

Kildare Village Phase 3 - Enabling Works

Enabling works contract for the new Phase 3 extension

View Project

Maynooth Small Works Contract

This project was undertaken in a number of different locations in and around the Maynooth Municipal District, including Prosperous, Straffan, Kilcock and Maynooth. Works ranged from the installation of new drainage, footpath upgrades to carriageway renewal

View Project

Pedestrian & Cycle Bridges over the Royal Canal

The scheme involves the design and construction of two bridges, one bridge dedicated to pedestrian use, with the second bridge provided for cyclists only

View Project

Dunboyne Link Road Bridge

This design and build scheme included the construction of a new river bridge and continued the link road from the Moyglare road to the Dunboyne road in Maynooth

View Project

Athy Distributor Road Advanced Works

These works were undertaken in advance of a new scheme to construct a distributor road around Athy

View Project

Stillorgan Village Upgrade - Phase 1

This project was the construction of new footpaths, cycle tracks, utility ducting, road re-surfacing and the installation of a new traffic light system at the junction of Kilmacud Road Upper and Kilmacud Road Lower

View Project
  • <
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • …
  • >

© Clonmel Enterprises LTD.

  • Home
  • Cookie Policy

We use Cookies By using this website, you consent to our cookies policy

don't show again