Experience Walls Filter by sector All sectors StructuresBridges Gantries Walls Road ConstructionStreetscapes New Construction Upgrade Works/Reconstruction Utilities Water & Waste Water Road Network Asset Management River/Marine Rail Peamount Boundary Wall Construction of a new stone masonry wall with steel railings and gates, 800m in length. View Project Knocklyon Junction - Phase 2 Tallaght to Ballyboden Cycle Scheme This scheme was undertaken to upgrade the existing siganlised junctions along this section and construct new cycletracks and footpaths in the area. View Project Leopardstown Link Road & Roundabout Reconfiguration Removal of the existing Leopardstown Roundabout and replacement with a signalised junction. The project also included the construction of a new link road to provide access to South County Business Park and Leopardstown Racecourse. View Project Holywell Link Road Construction of a 200m section of single carriageway including a new roundabout and upgrades to two existing roundabouts. View Project Retaining Wall Woodview Cottages Construction of reinforced concrete retaining wall to act as a flood barrier for Woodview Cottages. View Project Design and construction of Flood Barrier on Commons Road Design and construction of new flood wall and associated bank stabilisation and removal of collapsed sections of existing flood wall from the bank and river bed. View Project Rye River Restoration Works Refurbishment of the existing stone masonry retaining wall structure along the bank of the River Rye at the entrance to Leixlip Castle. View Project Outer Ring Road Phase 3 (N7-N81) Construction of 1.8km of new dual carriageway and the upgrading of 1.3km of existing single carriageway to include new bus lanes, cycleways and footpaths including existing Junction upgrades. View Project N7 Naas Road Widening & Interchanges Scheme Upgrade of 14km of dual carriageway to 3 lane carriageway, the construction of 16km of local roads, 4 No. new grade separated interchanges and upgrade works to 2 other interchanges. View Project Outer Ring Road Phase 2 (Adamstown-N4) Construction of 4.5km of new dual carriageway and the upgrading of 2.5km of single carriageway to dual carriageway. View Project < 1 2